PSWC Results

PSWC 2019

Overall 5th Place

Concrete Canoe: 25/200

Environmental: 50/150

Geotechnical Wall: 80/150

Surveying: 80/100

Transportation: 80/150

Timber Strong Design Build: 25/150

 

PSWC 2020

Overall 6th Place

Concrete Canoe: 11th Place

Environmental: 7th Place

Geotechnical Wall: 4th Place

Transportation: 3rd Place

Timber Strong Design Build: 5th Place

 

© 2019 CSULB ASCE

1250 Bellflower Blvd. 

Long Beach, CA 90840

Office: EN3-112

  • Facebook - White Circle
  • Instagram - White Circle
  • LinkedIn - White Circle